8000BPH Complete Carbonated Drinks Filling Line Project in Cameroon
Customer Project

Complete Carbonated Drinks Bottling Plant in Cameroon

An 8,000BPH fully automatic carbonated drinks bottling line for 500ml PET bottles and a 3,000BPH line for 1.5L bottles — from equipment manufacturing and workshop testing to on-site commissioning and operator training, with an approximately 90-day delivery lead time.
Project Overview

8000BPH Complete Carbonated Drinks Filling Line Project in Cameroon

In July 2020, ALPS Machine completed the installation and commissioning of a complete 8000BPH carbonated drinks filling line for a carbonated beverage producer based in Cameroon. The project involved supplying a fully automatic turnkey production line designed to process and package popular carbonated soft drinks, improve operational efficiency, reduce manual labor, and meet the customer's growing market demands.

The complete beverage production line integrates water treatment, syrup preparation, carbonation, PET bottle blowing, filling, labeling, and film packaging, along with essential utilities such as a steam boiler, water chiller system, air compressor system, and CO2 storage system. From equipment manufacturing and factory testing to on-site commissioning and operator training, ALPS Machine provided comprehensive support throughout the project.

图片4.png
Workshop Equipment Testing

Watch the workshop testing of the complete carbonated drinks production line before shipment.

Project Overview

Project DetailInformation
CustomerCarbonated Beverage Producer
LocationCameroon, Africa
IndustryCarbonated Soft Drinks Manufacturing
Project DateInstalled in July 2020
Project TypeNew Factory Setup (Turnkey Project)
ProductsCoke, Fanta, Energy Drinks, Sprite, Soda Water
Bottle Size500ml & 1.5L PET Bottles
Designed Capacity8,000 Bottles per Hour (for 500ml) / 3,000 BPH (for 1.5L)
Automation LevelFully Automatic
SolutionTurnkey Carbonated Drinks Bottling Line

Customer Requirements

The customer needed a complete turnkey bottling solution for a new factory to support the production and packaging of multiple carbonated soft drinks, including cola, orange soda, energy drinks, lemon-lime soda, and club soda in 500ml and 1.5L PET bottles. The main objectives were to establish a high-capacity production line, minimize manual intervention, and ensure stable, high-speed performance.

To meet these requirements, the customer needed an integrated system covering every stage of production—from raw water treatment and syrup mixing to bottle blowing, precise carbonated liquid filling, product labeling, and secondary film packaging, supported by necessary utilities.

图片2.png图片5.png

ALPS Machine's Turnkey Carbonated Drinks Solution

ALPS Machine supplied a fully automatic carbonated beverage production line, integrating multiple core processing and packaging systems into one synchronized workflow.

Water Treatment → Syrup Melting → Blending → Carbonation → PET Bottle Blowing → Filling → Labeling → Film Packaging (supported by a steam boiler, water chiller system, air compressor system, and CO2 storage system).

Each section performs a specific function, allowing materials and bottles to move through the manufacturing process smoothly and efficiently.

Main Equipment and Functions

What Each Machine Does

EquipmentFunction
Water Treatment SystemPurifies raw water to meet beverage production standards.
Syrup Melting & Blending SystemMelts sugar and precisely blends ingredients with treated water.
Carbonation SystemMixes purified water, syrup, and CO2 under low temperature and high pressure.
PET Bottle Blowing MachineBlows preforms into 500ml and 1.5L PET bottles.
Carbonated Beverage Filling MachineAdopts a professional carbonated beverage filling machine design to fill and cap bottles accurately without losing gas.
Labeling MachineApplies product branding labels securely onto the bottles.
Film Packaging MachineGroups and shrinks-wraps finished bottles into stable packs for transit.
Utility SystemsIncludes steam boiler, water chiller, air compressor, and CO2 storage to support the whole plant.

By integrating these systems, the project covers the entire manufacturing spectrum from liquid preparation to final package bundling.

图片3.png图片4.png

Project Implementation Process

1. Production and Testing

The complete carbonated production line had a delivery lead time of approximately 90 days after order confirmation. Before shipment, all machines were installed and interconnected at the ALPS Machine workshop for rigorous trial testing. In June 2020, factory tests using carbonated beverages confirmed that the 3-in-1 beverage filling machine and supporting units demonstrated high filling precision, stable pressure maintenance, and excellent overall equipment performance.

2. Equipment Delivery

Following successful factory testing, the equipment was packed securely and transported by sea to the customer's facility in Cameroon, arriving safely according to schedule.

3. On-Site Installation and Commissioning

ALPS Machine dispatched an experienced on-site engineer to the customer's factory in July 2020 to assist with equipment installation, layout coordination, debugging, and system commissioning.

4. Operator Training

The dispatched engineer provided professional, hands-on operation and maintenance training to the local workers, ensuring they were fully familiar with the running procedures and safety protocols of the new plant.

Project Results

图片7.png
Production Line Operation

Watch the carbonated drinks bottling line in operation at the customer's factory.

The new carbonated soft drinks line was engineered to meet the customer's high-volume manufacturing demands for 500ml (8000 BPH) and 1.5L (3000 BPH) bottles. Its turnkey configuration offers several key operational advantages:

  • High production output: Capable of reaching 8,000 bottles per hour for 500ml bottles, allowing the plant to easily fulfill large commercial orders.

  • Versatile product capability: Smoothly switches between multiple popular beverages like Coke, Fanta, Sprite, and energy drinks.

  • Reduced manual labor: Full automation across syrup preparation, bottle blowing, filling, and film packing cuts down heavy manual operations.

  • Stable carbonation quality: Advanced chilling and mixing systems ensure consistent gas volume and taste in every bottle.

Customer Feedback

The customer expressed sincere gratitude to ALPS Machine for providing a reliable turnkey bottling plant and dispatching a dedicated engineer for on-site support.

Management specifically highlighted the professional debugging services and the thorough operator training provided to their staff, which allowed the plant to launch smoothly into commercial production.

Conclusion

The Cameroon carbonated beverage project highlights ALPS Machine's capability to deliver comprehensive, end-to-end liquid production solutions for global beverage brands. From customized plant design and equipment manufacturing to on-site installation and staff training, ALPS Machine helps investors build efficient, high-performance beverage plants.

Planning to start a new carbonated soft drink factory or expand your beverage production lines? Contact ALPS Machine today to discuss a tailored filling solution designed for your specific business goals.

Customer Feedback

What Our Clients Say

★★★★★

"We sincerely appreciate ALPS Machine for providing a reliable turnkey bottling plant and sending a dedicated engineer to support our factory installation and commissioning."

Carbonated Beverage Producer
Carbonated Soft Drinks Manufacturing · Cameroon
★★★★★

"We particularly appreciate the professional on-site debugging services and thorough operator training, which helped our plant launch smoothly into commercial production."

Carbonated Beverage Producer
8000BPH Carbonated Drinks Bottling Line · Cameroon

FAQ

What production capacity does this carbonated drinks filling line support?

This project was designed for 8,000 bottles per hour for 500ml PET bottles and 3,000 bottles per hour for 1.5L PET bottles. The production line configuration is based on the customer's bottle sizes and output requirements.

What types of beverages can the production line handle?

The Cameroon project was designed for multiple carbonated soft drinks, including Coke, Fanta, energy drinks, Sprite, and soda water. The line integrates syrup preparation, carbonation, filling, and packaging systems.

How long is the delivery lead time?

For this project, the delivery lead time was approximately 90 days after order confirmation. Before shipment, all machines were installed and interconnected at the ALPS Machine workshop for trial testing.

Do you provide installation, commissioning, and operator training?

Yes. ALPS Machine dispatched an experienced on-site engineer to the customer's factory in Cameroon to assist with equipment installation, layout coordination, debugging, and system commissioning. The engineer also provided hands-on operation and maintenance training to local workers.

Can the equipment be tested before shipment?

Yes. Before shipment, the complete carbonated production line was installed and interconnected at the ALPS Machine workshop for trial testing. In June 2020, factory tests using carbonated beverages confirmed the filling precision, stable pressure maintenance, and overall equipment performance of the 3-in-1 beverage filling machine and supporting units.

Advanced Liquid Packaging Solutions !

×